City Transport Infrastructure Project - Construction of Fast Tram Infrastructure in zone 1, 4, 5, 6 in Cracow

Investor: Budimex Dromex S.A.

Project description:
  •     tram tracks on ferroconcrete slabs - 2 351 single-track metres
  •     tram tracks on pre-stressed concrete sleepers - 75 single-track metres
  •     track embedded on continuous grouting - 2 305 single-track metres
  •     concrete kerb stones - 1 640 m
  •     platforms with granite surface on a 20 cm stone sublayer – 800 m2
  •     surface made of hardened asphalt – 7 690 m2
  •     track partings - 554 single-track metres
  •     control and heating of tram track switches - 12 pcs
  •     catenary grid - installation of 70 catenary posts
  •     catenary wire length - 3 736 m
  •     traffic lights - electric and traffic part
  •     catenary wires - length of power wires - 880 m, length of return wire - 840 m
  •     reconstruction of medium and low voltage power lines - 12 050 m 
  •     reconstruction of the technical information network - 11 727 m of optic cable
  •     illumination of the Mogilski Fort
  •     electric channels for operating systems - 2 126 m
  •     street lamps - 217 lantern posts, including 6 087 m of lighting power cables
  •     construction and reconstruction of transformer stations
  •     installation of lifts and escalators: escalators - 6 pcs, lifts - 4 pcs

Period of delivery: 31st July 2006 - 31st May 2008

Project gross value: PLN 55 479 281.64
 

Construction of Fast Tram Infrastructure in zone 1, 4, 5, 6 in Cracow

Slide 1
Slide 2
Slide 3
Slide 4
Slide 5
Slide 6
Korzystając z naszej strony wyrażasz zgodę na wykorzystywanie przez nas plików cookies. Dzięki nim możemy indywidualnie dostosować stronę do Twoich potrzeb.
Napisz Dojazd